Rush Wall - Documents - Other evidence in support of anything in or relating to the application
Construction Environmental Management Plan
View Construction Environmental Management Plan
Construction Traffic Management Plan
View Construction Traffic Management Plan
Landscape and Ecology Management Plan
View Landscape and Ecology Management Plan
Environmental Statement
- Non Technical Summary
- Chapter 1
- Introduction
- Chapter 2
- Project Description
- Field Numbering Plan
- Planning Layout
- Fence Detail
- CCTV Detail
- Cable Crossing Reen
- Mounting System Detail
- Flood Risk Mitigation Layout
- Transformer Station Detail
- Transformer Analysis
- Farm DNO Access Road Section
- Buffer Zone Section Views
- Construction Traffic Management Plan
- Outline Construction Environmental Management Plan
- Landscape and Ecology Management Plan
- Chapter 3
- Methodology and Consultation
- Cumulative Schemes
- EIA Scoping Report
- EIA Scoping Direction
- Chapter 4
- Climate Change
- Chapter 5
- Ecology
- Preliminary Ecological Appraisal
- Invertebrate Survey
- Bat Activity Survey
- Badger Survey
- Great Crested Newt Survey
- Otter Survey
- Water Vole Survey
- National Vegetation Classification survey of reens
- Doormouse Survey
- Chapter 6
- Ornithology
- Winter Bird Survey
- Breeding Bird Survey
- Chapter 7
- Hydrology Water Quality and Flood Risk Updated 20211209
- Greenfield Runoff Rate Estimation Tool
- Water Monitoring Plan
- Chapter 8
- Landscape and Visual
- Site Analysis
- Site Views A-F
- Landmap - Visual and Sensory
- Landmap - Historic Landmap
- Landscape and Visual - Bibliography
- Landscape and Visual - Technical Information
- Chapter 9
- Heritage
- Depth of Peat
- Archaeological Desk Based Assessment
- ASIDOHL2
- Palaeoenvironmental Survey
- Chapter 10
- Transport (Road Users)
- Traffic Survey - A4810
- Traffic Survey - North Row
- Traffic Survey - Green Street
- Chapter 11
- Noise and Vibration
- Noise Chapter Appendices
- Chapter 12
- View Glint and Glare Study
- Solar Photovoltaic Glint and Glare Study
- Chapter 13
- Population and Human Health
- Chapter 14
- Conclusions
Flood Consequences Assessment FCA
View Flood Consequences Assessment FCA
Glint and Glare Study
HRA
View HRA
Planning Statement
- Planning Statement
- Appendix 1 - Site Location Plan
- Appendix 2 - Planning Layout
- Appendix 3 - Field Numbering Plan
- Appendix 4a - NCC Pre-Application Advice
- Appendix 4b - NCC Ecology
- Appendix 4c - NCC Highways
- Appendix 4d - NCC Landscaping
- Appendix 4e - NCC Trees
- Appendix 5 - MCC Pre-Application Advice
- Appendix 6 - Copy of Appendix 7 from the LEMP
- Appendix 7 - Email from Department of Environment and Rural Affairs
- Appendix 8 - PINS Scoping Direction
Site Selection Sequential Report
View Site Selection Sequential Report
Topographical Survey
Tree Survey Documents