Future

Basingstoke

Preston Farm Solar Park

Introducing Preston Farm Solar Park

BSR Energy is preparing to submit a planning application to Basingstoke and Deane Borough Council for a solar park on land at Preston Farm, Preston, Candover, Hampshire RG25 2DS.

The solar park would have an approximate design capacity of 28 MW and would produce enough clean, renewable electricity to power 7,002 homes per year, a saving of 6,202 tonnes of CO2.

What are the benefits of the Solar Park?

  • It will assist Basingstoke and Deane Borough Council to reduce greenhouse gas emissions in line with local and national targets, in addition to supporting its strategy for its declared Climate Emergency.
  • The proposed development will contribute towards the security of energy supply in Basingstoke and Deane through the provision of local, renewable energy supply.
  • No public rights of way will closed during or after construction of the solar park.
  • New hedgerow planting is proposed to contain and screen the solar arrays from its surroundings.
  • Ecological enhancements including wildflower and wild bird seed grasslands, and a range of breeding boxes for bats and birds are being considered as part of the application. We anticipate that the solar park will have a significant positive net biodiversity impact.
  • This is a temporary development (35 years), allowing the land to rest for the period of operation.
  • The proposed solar farm will not require Government subsidy.
  • British Solar Renewables UK is committed to using local suppliers during construction and operation where possible.
Preston Farm Sat
Preston Farm
Preston farm key

Where is the proposed Preston Farm Solar Park?

The project is situated on land at Preston Farm, Preston, Candover, Hampshire RG25 2DS. The approximately 116 acres (47Ha)
site will be located in several fields which are currently used for arable farming. In addition to having solar panels on the site, the proposal also includes biodiversity and landscape enhancement measures, such as the gapping up of existing hedgerows to ensure there are minimal visual and environmental impacts.

Location
Land at Preston Farm, Preston Candover, Basingstoke, Hampshire, RG25 2DS
Technology
Solar PV (Ground Mounted)
Size
28MWp design capacity
Land Size (approx.)
c. 47Ha (116 acres)
DNO
Scottish and Southern Electricity (SSE)
Land Designation
Agricultural, Grade 3b with isolated areas of 3a
Planning consent duration
Application is for 35 years
Planning submission date
1st November 2021
Planning decision date
Estimated February 2022

Australia Batman

Key statistics and facts about solar parks

Shotwick

Solar Photovoltaics

4028 Fareham Battery Site 10

Batteries