Murray Beaver, Head of Design and Engineering
Murray manages the Design & Engineering team, which supports every stage of a park’s lifecycle, from development through to EPC and O&M, maximising the efficiency of each build. Murray is passionate about delivering high quality designs that have a positive impact on the local environment and the national infrastructure. He was involved in the design and build of Bradenstoke, which was the UK’s largest solar park at the time of its construction.
“The demand for electricity is only going to increase as we move away from carbon intensive energy sources. Not only can solar help to supply that demand, but it can also enable the production of hydrogen on a large scale. I believe that solar has the right qualities to play a major role in achieving our net zero carbon emission targets”