Introducing Akeman Solar Park
Delivering clean energy and biodiversity gains for West Oxfordshire
Akeman Solar Park is a consented renewable energy project on land near Ramsden, West Oxfordshire. It will combine a 20MW solar farm with a 1.5MW Battery Energy Storage System (BESS), helping to deliver clean, homegrown energy while supporting long-term environmental improvements across the site.
Once operational, Akeman Solar Park is expected to generate enough renewable electricity to power around 6,060 homes each year.
Project timeline
Identify & survey
Finding the right land and grid connections, backed by in-depth feasibility and environmental studies.
Engage & tailor
Working with local authorities, parish councils, and communities to shape each proposal responsibly.
Approve & construct
Securing planning permission and delivering projects to the highest technical and environmental standards.
Operate & steward
Managing our sites for the long term, with biodiversity initiatives and a clear “leave no trace” approach.
Shaped through design
Developing renewable energy projects is never just about generating power. It’s about understanding a place and making sure a project sits well within it.
That’s why we’ve spent time understanding the site, listening to feedback, and refining the design throughout the planning process. The result is a smaller scheme that responds to its surroundings while delivering renewable energy, new habitats and long-term land stewardship.
Throughout the development process, we reviewed and refined the proposals in response to technical assessments, environmental studies and stakeholder feedback.
This included:
- Reducing the overall scale of the development.
- Removing solar infrastructure from the western, southern and north-eastern parts of the site.
- Increasing buffers around sensitive landscape and heritage features.
- Introducing additional planting, habitat creation and drainage measures.
These changes helped shape the approved scheme and reflect our commitment to developing projects responsibly and with the long term in mind.
Landscape and local character
The landscape around Ramsden is an important part of what makes the area distinctive. From the outset, a key focus has been designing a project that works with the existing character of the site.
Existing woodland, hedgerows and natural landform already help screen parts of the site, and additional planting will strengthen that over time. Landscape mitigation has been integrated throughout the design, alongside habitat enhancements that will continue to mature as the project becomes established.
The approved scheme was assessed in detail during the planning process, including its relationship with the surrounding landscape and nearby heritage features.
Net gain expected across the site
Habitats
Hedgerows
Biodiversity and nature protection
We believe renewable energy projects should leave the land in a better condition than they found it.
Alongside generating clean electricity, Akeman Solar Park has been designed to deliver significant gains for nature. The approved scheme will provide 48% Biodiversity Net Gain for habitats and 51.6% Biodiversity Net Gain for hedgerows, substantially exceeding the statutory requirement.
Improvements across the site will include:
- Species-rich grassland creation under the solar panels to provide good foraging resource for skylarks.
- Wildflower habitat establishment
- Creation of ‘wild bird’ seed strips along the boundary habitats, providing a wintering foraging resource
- Habitat improvements for birds and bats
- Reinstating a historic hedgerow, totalling 176m
- Hedgehog houses, bird boxes, hibernacula and invertebrate log piles and bat boxes to be implemented
- Additional nesting and roosting opportunities
- Deer push throughs: Occasional breaks in existing hedge boundaries retained to allow for deer herds to pass through the site.
- Long-term ecological management and monitoring.
These measures will help create a richer and more diverse landscape for wildlife over the lifetime of the project.
Drainage and flood risk
Good land management includes managing water effectively.
The approved scheme incorporates a range of drainage measures, including permeable access tracks, vegetated swales and additional planting designed to manage surface water across the site. A detailed drainage strategy for the project will be prepared at the discharge of condition stage.
Assessment work carried out as part of the planning process concluded that the project wouldn’t increase flood risk either within the site or elsewhere in the surrounding area.
Planning decision
Akeman Solar Park received planning permission following a detailed appeal process that considered landscape, ecology, heritage, drainage and wider planning matters.
In reaching its decision, the Planning Inspector concluded:
“The substantial benefits in favour of the development outweigh the harms I have identified and justify allowing the appeal.”
Further information, including planning documents and the decision notice, can be found below.
FAQs
Where is the site?
How will the site be accessed?
Why do we need solar?
What are the benefits of the proposal?
Are battery energy storage sites noisy?
How sustainable are batteries?
How will the land be used once the development reaches the end of its operational lifespan?
Will this impact the biodiversity on site?
Land is needed for food production. Why are renewable energy developments like this needed on land?
Get in touch
We're committed to remaining open and accessible as the project progresses.
If you'd like to ask a question, share feedback or find out more about Akeman Solar Park, we'd be pleased to hear from you.