Hadlow – 18.9 MW

Hadlow – 18.9 MW

Portfolio
[vc_row][vc_column][rev_slider_vc alias="hadlow"][/vc_column][/vc_row][vc_row][vc_column width="3/4"][vc_row_inner][vc_column_inner width="2/3"][vc_column_text] Hadlow [/vc_column_text][vc_table vc_table_theme="classic_blue"]location,Kent|CAPACITY,18.9%20MW|AREA,57.6%20acres|COMMISSION%20DATE,2015|CONNECTION%20VOLTAGE,UKPN%2033kV[/vc_table][/vc_column_inner][vc_column_inner width="1/3"][vc_single_image image="769" img_size="full"][/vc_column_inner][/vc_row_inner][/vc_column][vc_column width="1/4"][vc_widget_sidebar sidebar_id="cs-1" el_class="portfolio-side" title="Recent Projects"][/vc_column][/vc_row]
Read More
Owls Hatch – 51.9 MW

Owls Hatch – 51.9 MW

Portfolio
[vc_row][vc_column][rev_slider_vc alias="owls-hatch"][/vc_column][/vc_row][vc_row][vc_column width="3/4"][vc_row_inner][vc_column_inner width="2/3"][vc_column_text] Owls Hatch [/vc_column_text][vc_table vc_table_theme="classic_blue"]location,Herne%20Bay|CAPACITY,51.9%20MW|AREA,196.88%20acres|COMMISSION%20DATE,2015|CONNECTION%20VOLTAGE,UKPN%20%20%20132kV[/vc_table][/vc_column_inner][vc_column_inner width="1/3"][vc_single_image image="763" img_size="full"][/vc_column_inner][/vc_row_inner][/vc_column][vc_column width="1/4"][vc_widget_sidebar sidebar_id="cs-1" el_class="portfolio-side" title="Recent Projects"][/vc_column][/vc_row]
Read More
Swindon – 60.2MW

Swindon – 60.2MW

Portfolio
[vc_row][vc_column][rev_slider_vc alias="swindon"][/vc_column][/vc_row][vc_row][vc_column width="3/4"][vc_row_inner][vc_column_inner width="2/3"][vc_column_text] Swindon Swindon Solar Park was developed in conjunction with We-Link Energy on land owned by the British Science Museum. The park was built on the former RAF Wroughton airfield, alongside the test track for a certain popular TV show about cars… Swindon was another example of BSR’s ability to deliver large, quality projects under tight deadlines, with the park being built in under 10 weeks & during very wet weather. The energy generated by this site is taken by HSBC bank in order to power their UK operations under a 15 year sleeved PPA agreement. This innovative offtake structure enables HSBC to lock in certainty around their long term cost of green energy while simultaneously de-risking the cashflow profile for the owners of the solar park.…
Read More
Shotwick – 72.2 MW

Shotwick – 72.2 MW

Portfolio
[vc_row][vc_column][rev_slider_vc alias="shotwick"][/vc_column][/vc_row][vc_row][vc_column width="3/4"][vc_row_inner][vc_column_inner width="2/3"][vc_column_text] Shotwick Shotwick Solar Park was developed in conjunction with We-Link Energy & Compton Group. It is the largest solar park in the UK at 72.2 MW. The site was built in just over 8 weeks, an incredible achievement for a park of this scale. The site is connected directly to the private infrastructure of the UK’s largest paper mill, offsetting roughly one third of their annual electricity demand & making it the largest private wire solar park in Europe[/vc_column_text][vc_table vc_table_theme="classic_blue"]Location,Flintshire|CAPACITY,72.2%20MW|AREA,250%20ACRES|COMMISSION%20DATE,30%20MARCH%202016|CONNECTION%20VOLTAGE,132%20kV[/vc_table][/vc_column_inner][vc_column_inner width="1/3"][vc_single_image image="223" img_size="full"][/vc_column_inner][/vc_row_inner][/vc_column][vc_column width="1/4"][vc_widget_sidebar sidebar_id="cs-1" el_class="portfolio-side" title="Recent Projects"][/vc_column][/vc_row]
Read More
Bradenstoke – 69.8 MW

Bradenstoke – 69.8 MW

Portfolio
[vc_row][vc_column][rev_slider_vc alias="bradenstoke"][/vc_column][/vc_row][vc_row][vc_column width="3/4"][vc_row_inner][vc_column_inner width="2/3"][vc_column_text] Bradenstoke This solar park was the first to be developed with the British MOD, situated on the site of a former runway that forms part of the RAF Lyneham base. At the time of its completion the site was comfortably the largest in the UK at just under 70 MW DC. The site used an innovative approach to commissioning by connecting initially into a private supply while the lengthy 12 km grid connection route was under construction.[/vc_column_text][vc_table vc_table_theme="classic_blue"]location,Wiltshire|CAPACITY,69.8%20MW|AREA,213.3%20ACRES|COMMISSION%20DATE,31%20MARCH%202015|CONNECTION%20VOLTAGE,132%20kV[/vc_table][/vc_column_inner][vc_column_inner width="1/3"][vc_single_image image="224" img_size="full"][/vc_column_inner][/vc_row_inner][/vc_column][vc_column width="1/4"][vc_widget_sidebar sidebar_id="cs-1" el_class="portfolio-side" title="Recent Projects"][/vc_column][/vc_row]
Read More